Community Profile

photo

ragavendiran appavoo


Last seen: 5 dagar ago Active since 2021

Followers: 1   Following: 0

Statistics

  • 5-Star Galaxy Level 1
  • Personal Best Downloads Level 2
  • First Submission
  • Explorer

View badges

Feeds

View by

Submitted


IEEE 13 bus system with DVR
DVR with fault and without fault using RLS algorithm

ungefär 3 år ago | 15 downloads |

Submitted


3 Machine 9 Bus system with DPFC
FACTS device which is the DPFC on the critical clearing fault time in multi-machine power system

ungefär 3 år ago | 5 downloads |

Submitted


Three machine nine bus system with Power system stabilizer
a 3 machine 9 bus system is considered and in turbines and regulator block we used power system stabilizers to add damping to th...

ungefär 3 år ago | 7 downloads |