photo

Karl-Martin


Active since 2014

Followers: 0   Following: 0

Message

Statistics

MATLAB Answers

4 Questions
3 Answers

RANK
8 886
of 300 015

REPUTATION
5

CONTRIBUTIONS
4 Questions
3 Answers

ANSWER ACCEPTANCE
100.0%

VOTES RECEIVED
4

RANK
 of 20 862

REPUTATION
N/A

AVERAGE RATING
0.00

CONTRIBUTIONS
0 Files

DOWNLOADS
0

ALL TIME DOWNLOADS
0

RANK

of 166 984

CONTRIBUTIONS
0 Problems
0 Solutions

SCORE
0

NUMBER OF BADGES
0

CONTRIBUTIONS
0 Posts

CONTRIBUTIONS
0 Public Channels

AVERAGE RATING

CONTRIBUTIONS
0 Highlights

AVERAGE NO. OF LIKES

  • Thankful Level 1
  • Revival Level 1
  • First Answer

View badges

Feeds

View by

Answered
arima estimate error with garch
Allthough you did specify Q=1, the parameter can be excluded from the model. In the 'garch.m' function of the Econometrics to...

mer än 10 år ago | 1

Answered
Error using garch/validateModel; Non-zero degree P requires a non-zero degree Q.
Hi Jason, I got this error in my modelling too and I suppose it happens to occur as follows: In the 'garch.m' function...

mer än 10 år ago | 0

Question


How to show 95% quanile in a Boxplot ?
Hi, I want to compare the forecast performance of Value at Risk (VaR) from two different models by using a boxplot. Put diffe...

mer än 10 år ago | 1 answer | 2

1

answer

Answered
Estimate GARCH(4,1) using estimate: Parameter GARCH{2} is missing
Nevermind, I found the solution. In the 'garch.m' function of the Econometrics toolbox it is stated: % o The coefficients...

mer än 10 år ago | 0

| accepted

Question


Estimate GARCH(4,1) using estimate: Parameter GARCH{2} is missing
Hi, I want to fit an AR(1) Model to a time series of returns (x) and the variance process follows a GARCH(4,1) model. mo...

mer än 10 år ago | 1 answer | 1

1

answer

Question


Do my Toolboxes work?
Hi, I want to fit a Conditional Variance Model, given some specified data, using: model = arima('ARLags',1,'Variance',ga...

nästan 11 år ago | 2 answers | 0

2

answers

Question


How to plot data with corresponding dates
I have a vector with data (1x9324 double) and another vector (1x9324 cell) with the corresponding dates. Both vectors are from ...

ungefär 11 år ago | 1 answer | 0

1

answer