Antonio Melieni
Followers: 0 Following: 0
Statistics
14 Questions
0 Answers
RANK
11 267
of 296 163
REPUTATION
4
CONTRIBUTIONS
14 Questions
0 Answers
ANSWER ACCEPTANCE
50.0%
VOTES RECEIVED
4
RANK
of 20 355
REPUTATION
N/A
AVERAGE RATING
0.00
CONTRIBUTIONS
0 Files
DOWNLOADS
0
ALL TIME DOWNLOADS
0
RANK
of 155 535
CONTRIBUTIONS
0 Problems
0 Solutions
SCORE
0
NUMBER OF BADGES
0
CONTRIBUTIONS
0 Posts
CONTRIBUTIONS
0 Public Channels
AVERAGE RATING
CONTRIBUTIONS
0 Highlights
AVERAGE NO. OF LIKES
Feeds
Question
Test Results in a table
Hi I need to performe an adf test for several columns of an array and need the results for all of the columns in one table. ...
mer än 5 år ago | 1 answer | 1
1
answerQuestion
How can I divide a week of a timetable into hours
Hi, is it possible to devide a week of a timetable into 168 hours? I would need the means of a timetable from monday to sun...
mer än 5 år ago | 1 answer | 0
1
answerQuestion
How can I remove holidays from a timetable
Hi, How can I remove the holidays from a timetable? Thx :)
mer än 5 år ago | 1 answer | 0
1
answerQuestion
How can I group a timetable in hours 0-24h
Hi, I have a timetable with tick data of FX rates on a minutely basis. The timetable is 527040 x 4 Starting from the 01.01....
mer än 5 år ago | 1 answer | 0
1
answerQuestion
How can I extract the time column of a timetable
Hi, I need to extrct the time column of a timetable as I need to manipulate it. any Ideas?
mer än 5 år ago | 2 answers | 2
2
answersQuestion
How to sum over next delta of rows
Hi, I have a 527040 x 4 table I need a new table, that gives me for each i = size(array,1) the sum of the next delta of rows...
mer än 5 år ago | 0 answers | 0
0
answersQuestion
How do I get the mean of always 4 columns
Hi, I have a 527040 x 16 double array I need the row mean of always 4 clomuns So I need the row mean of column 1:4 5:8 9:...
mer än 5 år ago | 2 answers | 0
2
answersQuestion
Moving sum in a timetable
Hi, I've timetable with 2 clomuns (time column) 527040×1 datetime and 527040×1 double (1st column) , please look at my attach...
mer än 5 år ago | 1 answer | 0
1
answerQuestion
Sum rows in timetable
I have a timetable with minutley reutrns. In each row is a timestap and the return I now want to calculate the daily returns a...
mer än 5 år ago | 1 answer | 0
1
answerQuestion
How can I calculate a row mean of a timetable
Hi I have a 527400x4 timetable and now I want to calculate the mean of each row any ideas=
mer än 5 år ago | 0 answers | 0
0
answersQuestion
convert .xlsx file into a timetable
Hi :) I have the following excel sheet and I want to convert it into a time table. The first row should be the "datetime" ro...
mer än 5 år ago | 2 answers | 1
2
answersQuestion
matrix log of certain columns
Hi :) I have to matrices 527040x4 and 527040x4 now i want to calc the log(m1c1) + log(m2c1), log(m1c2)+log(m2c2), log(m1c3)...
mer än 5 år ago | 1 answer | 0
1
answerQuestion
Mean over specific columns
Hi :) I have a 450x42 table. I would like to calculate the mean over cloumns 2:5 7:10 12:15 and so mean([2:5],2) mean([7:1...
mer än 5 år ago | 1 answer | 0
1
answerQuestion
How can I convert several tables into cell arrays
Hi :) I have 6 tables in my workspace and I want to convert them all into cell arrays. Is this possilble by a loop for examp...
mer än 5 år ago | 0 answers | 0