Multi Machine Stability

This model facilitates understanding the concept multi-machine stability

You are now following this Submission

This is a model of the system in example 16.9 in Power System Analysis book, Stevenson. Three-phase fault is applied at time 20 s and the fault is cleared at 20.3 s. 20 s was chosen to study the fault effect after the system reaches steady state operating conditions. You can zoom in the time interval 20-20.3 in the scope to observe the rotor swinging under fault. The critical clearing time is approximately 0.55 s; it differs from that mentioned in the book since the system in this model employs PSS for each machine, which is more related to real world systems.

Cite As

Hamzeh Jamal (2026). Multi Machine Stability (https://se.mathworks.com/matlabcentral/fileexchange/50117-multi-machine-stability), MATLAB Central File Exchange. Retrieved .

General Information

MATLAB Release Compatibility

  • Compatible with any release

Platform Compatibility

  • Windows
  • macOS
  • Linux
Version Published Release Notes Action
1.0.0.0