Link two sets of requirements between them and see the 'Implemented' and 'Verified' status. Only one set is linked to the model

6 views (last 30 days)
I have the following situation:
I have two sets of requirements(see the picture below), 'HackathonCusReq' and 'HackathonReq', they are the same from a functional point of view, only with small adjustments in the second set.
The second set is linked to the model, and as you can see it is almost 100% Implemented and verified (blue color in the right side). The first set of req is not linked to the model.
What I want to do is to put a link between the requirements from the first set of req to the second set of req, so that the status will appear in the first set as well, in the column named 'Implemented' and 'Verified'. So basicly I want to obtain the status of Implemented and Verified for the first set from the second one, not from the model.
For example, in the picture below, at 'HackathonReq', ID ATSWC_SWReq_2, Index 1.1, the status of Implemented and Verified is 100%(all blue), so I want it to have this status(all blue) also for 'HackathonCusReq', ID req_2, Index 1.1.
How can I do this without linking again to the model, but only linking the requirement sets between them?

Answers (0)